Electrical testing and commissionings

Electrical testing and commissioning

  • Electrical Insulation Resistance Testing.
  • ELECTRICAL WIRING CONTINUITY TESTING.
  • Electrical Earth Continuity Path Testing.
  • Electrical Testing of Non-linked Single Pole Switches.
  • Electrical Earth Resistivity Testing.
  • HI potential Test (AC/DC/VLF)
  • High Current Test (500A to 15000A+).
  • Secondary current test.
  • Relay test and settings.
  • Power factor test.
  • Winding Resistance Test
  • Transformer Turns Ratio (TTR) Test.
  • Current Transformer Test.
  • Power Recorder.
  • Load Bank.
  • Interlock & Trip matrix check.
  • Whole dummy test.
  • Testing of CT's and PT's.
  • Power Transformer Oil Analysis.
  • Transformer stability test.